Retime Stage Reports

For Intel® Stratix® 10 and Intel® Agilex™ designs, the Fitter generates detailed reports showing the results of the Retime stage, including the Retiming Limit Details report. This report lists the limiting reason, along with the critical chain and recommendations for the critical chain for each clock transfer.
Figure 1. Retiming Limit Details