Agilex™ 7 FPGA I-Series Development Kit User Guide

ID 683288
Date 4/05/2024
Public
Document Table of Contents

A.13.3. Power Sequence

Agilex™ 7 FPGA requires proper power-up sequencing.

For more details on the power sequencing groups, refer to Table: Voltage Rails Group in the Agilex™ 7 Power Management User Guide.

For more information on the connection guidelines, refer to the Agilex™ 7 Device Family Pin Connection Guidelines.

Figure 47. Power Sequence